About Sewage Treatment Plant - 75m3 Per Day
A 70 KLD STP is a wastewater treatment system designed to process 70,000 litres per day, converting sewage into reusable or environmentally safe discharge water.
Treatment Process
Typical stages include:
- Screening & grit removal removes large solids
- Equalization tank balances flow load
- Biological treatment (MBBR / SBR / ASP) breaks down organic waste
- Secondary clarification sludge settling
- Tertiary treatment filtration + disinfection
These systems remove:
- Suspended solids
- Oil & grease
- Organic pollutants (BOD/COD)
- Pathogens and bacteria
STPs ensure wastewater is treated before discharge, preventing pollution and enabling
Robust FRP Construction for Long-term DurabilityThis sewage treatment plant utilizes FRP (Fiber Reinforced Plastic) construction, offering exceptional resistance to corrosion and harsh industrial environments. Its sturdy build leads to a longer service life and reduced maintenance costs, making it a cost-effective choice for industries seeking reliable wastewater treatment solutions.
Automatic Operation for Consistent PerformanceThe plant features a fully automatic operational system that minimizes manual intervention and human error. This automation enhances the plant's efficiency and consistency in treating sewage, offering peace of mind to facility managers and reducing the need for constant monitoring.
FAQ's of Sewage Treatment Plant - 75m3 Per Day:
Q: How does the 75m3 Per Day Sewage Treatment Plant function in industrial settings?
A: The plant uses an automatic treatment process to collect and purify sewage, operating continuously to handle up to 75 cubic meters per day. Its FRP structure endures tough industrial conditions, ensuring optimal performance and reliable sewage management.
Q: What materials are used in constructing this sewage treatment plant?
A: This sewage treatment plant is constructed from high-quality FRP (Fiber Reinforced Plastic), which provides excellent durability, chemical resistance, and a long operational life.
Q: When is it recommended to use this sewage treatment plant?
A: This plant is ideal for when industrial facilities generate substantial volumes of wastewater daily, particularly when a capacity of 75m3 per day is needed for compliant disposal and environmental safety.
Q: Where can this sewage treatment plant be installed?
A: It is suitable for installation at various industrial sites, including manufacturing units, processing plants, and industrial parks across India, provided adequate space and electric power supply are available.
Q: What is the process followed by the plant to treat sewage?
A: The plant employs an automated multi-stage treatment process, including physical, chemical, and biological methods, to remove contaminants and produce treated water that meets regulatory standards.
Q: How do users benefit from installing this FRP sewage treatment plant?
A: Users gain from reduced environmental risk, lower maintenance requirements, compliance with wastewater regulations, and enhanced operational efficiency due to its automated and durable design.