Call us now
07315121736
A 70 KLD STP is a wastewater treatment system designed to process 70,000 litres per day, converting sewage into reusable or environmentally safe discharge water.
Typical stages include:
These systems remove:
STPs ensure wastewater is treated before discharge, preventing pollution and enabling






Price:
Price 500000.0 INR / Unit
Minimum Order Quantity : 1 Piece
Capacity : 5m3 Per Day Or 0.2083 m3/hr
Application : Industrial
Material : MSEP
Power Source : Electric
Price 2000000.0 INR / Unit
Minimum Order Quantity : 1 Piece
Capacity : 40m3 Per Day or 1.667 m3/hr
Application : Industrial
Material : FRP
Power Source : Electric
Price 3000000.0 INR / Unit
Minimum Order Quantity : 1 Piece
Capacity : 100m3 Per Day or 4.167 m3/hr
Application : Industrial
Material : FRP
Power Source : Electric
Price 750000.0 INR / Unit
Minimum Order Quantity : 1 Piece
Capacity : 10m3 Per Day or 0.4167 m3/hr
Application : Industrial
Material : FRP
Power Source : Electric